    Accepting applications for new installation of water usage

    • Date:2014-02-25

    ● New installation of hydro-appliances (accepting applications for new installation of water usage)


    New installation of hydro-appliances (accepting applications for new installation of water usage) Documents needed:
    1. Application form (with certificate of membership in Water Pipe Engineering Industries) .
    2. Seal of the applicant.
    3. Architectural hydro-appliance design for applied installation (drawn by architects or professional technicians; design for buildings of 5 stories or less, exempt from architects’ supervision, can be drawn by A-ranking plumbing contractors.
    4. Documents for application:


    (1) For buildings constructed after Dec.22, 1971 please prepare any of the documents below: Builiding use license or title deed to the house  Building completion certificate Building certificate in districts that do not issue building permits Letter of consent for “water pipe connection in old legal house” written up by local municipal, county governments or township offices.
    (2) For buildings constructed before Dec.22, 1971 please prepare any of the documents below, registered before that date: Certificate transcript of the house, construction license or building registered certificate Immigration registration in household Tax payment certificate Utility bill payment receipt or certificate.
    (3) An authorization letter from the owner or supervisor should be obtained in advance by the applicant in case
    the external line must go through others’ properties, houses or be connected to others’ water pipes.
    Flow chart illustration of new installation: Submissiondesign, survey, construction cost estimation, inspection and pressure test (4 days) payment notice to the applicant (instant processing)  road digging application (instant processing) road digging construction permit(8 days) final accounting (2 days)-application for starting usingwater meter installation
    Water usage application for new installation of hydro-appliance in accordance with a certain scale of standardized warehouse
    Application item: water usage application for new installation of hydro-appliances in accordance with a certain scale of standardized warehouse
    Processing time of faucet water supply application for buildings below, in accordance with a certain scale of standardized warehouse is shortened for ten days in principle, exclusive of users’ payment period and time for application for road diggingpermit.


    Flow chart illustration of new installation:


    Flow chart illustration of new installation