台灣自來水公司

Font

You are here: Home > Customer Services > Application Notice
  • Print
  • Forward
  • Go Back

    Water Equipment

      Application Items

      Internal Line Diagram Preview

      Required Documents

      1.The application form for the internal design drawing of water

         equipment is in triplicate.

      2.A copy of the construction license (copy both front and back).

      3.Construction start-up report

      4.One copy of the electronic file (disc) of the internal drawing of

         the water equipment.

      5. If the preliminary review is th same as preview, the

          construction number will be filled in the original design of

          the preview, and the review result column of the application

          review form states that the preview diagram of the water

          equipment internal chart is the same  as the preliminary

          review. And with the addition of the architect's big and small

          chapters, the preview work is completed.

      6. If the design drawings of the water equipment are not sent to

          the preliminary review or the original plan is changed, the

          documents for submission include all the documents (1) to 

          (4) and the first preliminary review (2) to (5).

      Flowchart

       

      Application Items

      New Installation

      Required Documents

      I. Required Documents:

      1. Application form, Taiwan Water Corporation Consumer Water Supply

      Service Contract and Taiwan Water Corporation Personal Information

      Protection.(Attached with proof from the water pipe engineering industry)

      2. Applicant seal & identification card.

      3. Internal Pipeline Diagram (If the preview is not required, the review is required.)

      4. Documents for application:

      (1) Buildings in areas where urban plan is implemented, please prepare any

      of the documents below:

      •Builiding use license or entitle deeds.

      •A certificate of finished building

      A certificate of improvement completion in an area where building

      control has not yet been implemented.

      •The letter issued by the local county (city) government or township (city

      or district) office which can verify the legitimacy of the old building water use.

      (2) Buildings in areas where urban plan is not implemented, please prepare

      any of the documents below:

      •Copy of building, the construction license or registration transcript of

      building.

      •Household immigration certificate.

      •Proof of tax filings.

      •Receipt (certificate) of water bill and electricity bill.

      5.If the external line (water-using facility) requires passing through other

      people's land, houses, or connecting to other people's water pipes, the applicant shall

      obtain a letter of consent the approval or recognizance from owner or the management in

      advance.

      6.For commissioned application, the trustee is required to check and verify

      related information.

      7.For the construction project started after January 21,2016, if the

      water-using facility involved in the review items of “user water-using facility reference

      national standard number and name”, its new installation should submit the inspection

      documents in accordance with National Standards from laboratory which is approved by the

      Taiwan Accreditation Foundation(TAF).

      II. Engineering temporary water installation:

      1. Application form and Taiwan Water Corporation Consumer Water Supply

       Service Contract.

      2. Applicant seal & identification card.

      3. The construction license or engineering contract cover.

      4. Location map (Cadastral map in principle).

      5. Various change service application.

      6. Pay the guarantee fees of temporary water or attach the water fee full

          payment guarantee. (You can make it up before start the use of engineering temporary

          water.)

      7. If the external line (water-using facility) requires passing through other

       people's land, the applicant shall obtain a letter of consent or recognizance from

       landowner in advance.

      Flow chart

       

      Application Items

      Initiation

      Required Documents

      1.Applicant seal

      2.Building license

      3.Taiwan Water Corporation Various Change Service

         Application and Taiwan Water Corporation Consumer

         Water Supply Service Contract(For commissioned

         application, the trustee is required to check and verify

         related information.)

       

      Application Items

      Remodeling Installation

      Required Documents

      1.Identity Document

      2.Applicant seal

      3.The previous or current period water bill receipt.

      4.Taiwan Water Corporation Various Change Service

         Application

       

      Application Items

      Termination

      Required Documents

      1.Identity Document

      2.Applicant seal

      3.The previous or current period water bill receipt.

      4. Taiwan Water Corporation Various Change Service

          Application

      Reference

      Applicant must be the owner of the house (Please show the

      ownership of the building as proof).

       

      Application Items

      Suspension / Restoration

      Required Documents

      1.Identity Document

      2.Applicant seal

      3.The previous or current period water bill receipt.

      4. The user who have overdue water fee and be stopped

          water, should pay an one-half of the basic fee, restoration

          fee and the overdue water fee during the water stop

          period when apply for restoration. If you have stopped

          water for more than two years, you should apply for the

          new installation procedure.

      5.Taiwan Water Corporation Various Change Service

         Application.

      Reference

      Client who is applying for suspension of the water service

      will not be charged of the basic fees within the suspension

      period.

       

      Application Items

      Installment Payment for External Pipeline Construction

      Required Documents

      1.Apply for water-using facility external lines expense

         through installment payment shall be subject to the

         following requirements:

        (1)You have had household registration in the place of

            installation.

        (2)For the newly installation project which the caliber of

            water meter is less than 25mm, and the length of

            pipeline less than 20meters.

        (3)The classification of water supply is common water.

      2.Apply for installment payment is limited to the

         construction expense, the rest of the expenses should be 

         paid when applying for the new installation project.

      3. Installment payment method: Every two months is

          selected as the payment period, and the maximum period

          not to exceed three years.

      4.When applying for installment payment, the applicant

         should fill out the application form and guarantee, and

         submit the related documents with residency registration.

      5. The guarantor should meet the following requirements:

        (1)The guarantor shall be the name of the water owner and

             shall apply for the owner of the water building; if the

             name of the water owner is inconsistent with the owner

             of the building, the name of the water owner and the

             owner of the building shall be jointly guaranteed.

        (2)The guarantor's water address must be in the same TWC

            district management office as the applicant's application

            address.

      6. The guarantor should check the following documents and

          go to the local service (operation) of TWC to handle the

          insurance procedures:

        (1)Identification document

        (2)The ownership of the building of the guarantor's water

             use location

        (3)Recently paid water bills

       

      Application Items

      Installation Proof

      Required Documents

      1.Application form

      2. The previous or current period water bill receipt.

      Reference

      If the user has no outstanding fees, they can apply online or

      by phone.

       

      • Updateing Date:2019-08-15 15:24:00
      • Hit:43